Hello there, Fundy Campers!
We trust you were blessed by the events we hosted this summer. In keeping with our plans for the future, there’s still some work to be done to meet our goals. The following is a breakdown of work days planned for this fall, as well as specific jobs that need to be done. Many hands make for light work. We hope to see you there!
The planned work days are:
Sept. 23 and Oct. 21* (Water Turn off)
*Oct.21 will depend on weather, both days are full work days.
We have put together a list of items that need to be addressed.
If you see an item you are skilled to complete please contact Wade.
In no particular order, they are:
• Small evangelist cabin – Jack up at least 18”
• Cabin #10 – Level deck, paint trim
• Dorm building #21/22 – Install front gutters, replace fascia board & fix rear gutters, trim trees in back, paint trim.
• Youth building – Replace rotten deck boards, paint doors, coat under building poles with bug repellent.
• #61 (newest rental) Clean roof, re-route drain, electrical stack.
• Cabin #25 – Paint, replace a couple 4”x 4” under cabin.
• Cabin # 27 – Replace a two 4”x 4” underneath cabin, install front gutter, replace rear fascia board, clean roof, new door step.
• Pray Chapel – Power wash to prepare for paint, new front step.
• Vesta Legge Memorial Building (children’s centre) – 3 new steps, paint trim.
• Cabin #17 – New step, paint trim.
That’s the short list!